Wednesday, 13 September 2017

BB`s WALL



THESE WALLS ARE DESTERNED FOR MY RAILWAY LAYOUT


                       BUT SUCH WALLS ARE MADE FOR PLAYING WITH IDEAS  SO
                  

                      















Dipping in colour-wash.  Emulsion Paint & Water.


                  

I use an oblong deep soap box. This comes in handy for castings that need a deep 2 seconds dip.
They dried in seconds.


                                                                            Buttresses








Over 12 foot of wall that will be silicone together with a buttress between each piece.


The rubber mould method works fine and DANDY for such a BEANO BOY as me!
  Some extra colours to be dry-brushed on later.                                               

                                                                   THE END

                                                    THANKS FOR LOOKING BB

No comments:

Post a Comment