PART TWO OF BB`s WALL PROJECT



A LITTE BIT EXTRA

Adding more detail to give added interest.



In this case,a small gothic door like the one seen above. First of all the shape was scraped into place and then work began to chisel and scrap and scribe out the raised entrance way for the door. After that the defining of the stone work surrounding the entrance and the actual wall was scribe out.




The medical plaster stuck onto the scribing tool where the file was upon the stem. It saved my hand from sore chaffing. Better there in the first place upon metal then placing it upon a rather sore hand.
A good tip when using hand scribing tools.


The little gothic door slipped deeply into place giving it the normality look of it being planted there for many a long year. The last of the wall was then finished off in the repetitive style of deep shadow line scribing.



Yes I am most pleased with the look. Wooden steps would have led up to the entrance in days long gone by. And so it is that the work ongoing is gradually falling up into place.

Thank you for viewing a little bit extra.  BB

2 comments:

  1. Inspiring as always BB, your knowledge and skill never cease to amaze me.

    ReplyDelete
    Replies
    1. Thank you Russ,you are very kind to take time out to view and also comment. BB

      Delete